DDOT’s Southeast Boulevard Feasibility Study Final Draft Released

Jan 07, 2016 | Posted in Barney Circle-Southeast Boulevard Documents, Project Updates
Tagged: ,

DDOT conducted a Feasibility Study to determine the project development process and the viability of the three concepts from OP’s Southeast Boulevard Land Use Study. The final draft of the Feasibility Study was completed and released on January 7, 2016.

Southeast Boulevard Feasibility Study Draft Final