What Has DDOT Accomplished Since AWI was Launched In 2000?

Apr 22, 2012 | Posted in Frequently Asked Questions

Among other progress, DDOT’s most significant advances include:

11th Street Bridge Project – As of spring 2012, two new freeway bridges were open to traffic, with a third local bridge slated for opening in mid 2012. Ramps connecting the freeway bridges to and from the north on DC 295 will in Fall 2012. Construction of the $390 million project, the largest in DDOT history, began in December 2009.

Anacostia Riverwalk Trail – To date , 12 of the planned 20 miles of the Anacostia Riverwalk Trail were in use by recreational and commuter cyclists. In Spring 2012, two new sections of trail opened: a new trail bridge over railroad tracks north of the John Philips Sousa Bridge west of the river and an improved connection from the Tidal Basin to the Fish Market.

Frederick Douglass Memorial Bridge/South Capitol Street Improvements – Laying the groundwork for construction, a Final Environmental Impact Statement was signed in March 2011 and preliminary engineering began in January 2012. In 2007, DDOT took initial steps to improve the corridor by lowering the west end of the Douglass Bridge and removing the elevated structure of South Capitol Street. The work reconnected neighborhoods on both sides of the road and providing much-improved pedestrian and other access to Nationals Park and other attractions.

0 Comments

Leave a comment